
An oil drilling contractor in SE Asia wanted to clean and repair a tank whilst minimizing confined space entry...
Read More
A petrochemical plant noticed a leak from a 38-inch flange on the side of a reboiler with an operating T and P of 375 degC and 36 barg respectively...
Read More
A petrochemical plant had a critical and very dangerous leak on a heat exchanger that needed repairing quickly and without impacting production...
Read More
A petrochemical plant had to stop a leak on an 80 inch gas/water line....
Read More
A SE Asia refinery needed to revamp their RFCC unit by installing new internals to increase capacity, improve process efficiency and optimize yields...
Read More
A refiner in SE Asia needed to perform maintenance of their flare system during a planned Turnaround...
Read More
A Gas Separation Plant in SE Asia needed to perform the inspection and maintenance of their flare tip and riser system for the first time since being ...
Read More
An offshore operator in SE Asia required 8 vessels to be specially modified within a 10-day timeframe to boost production....
Read More
A refiner in Asia planned to clean 359 heat exchangers during a shutdown to regain process efficiencies and boost production. The cleaning needed to...
Read More